Nord Stream 2 - When is a Pipeline Really Built?
The Nord Stream 2 - saga continues. The German energy regulator Bundesnetzagentur rejected an application of the Nord Stream 2 operating consortium to obtain an exemption from EU unbundling rules after the Gas Directive was amended in 2019. The argumentation of the regulator strikes at a crucial point - is a pipeline already built when 160 kilometres are still missing?